Tuesday, 1 July 2014

Provisional Asset Management details of Government Schools 2014-15 
1
Name of School

2.
Postal Address

3.
E-mail

4.
Phone land line

5.
Name of HM and Phone number

6.
Land Details

· Type Of  Ownership
Owned/Rented/Rent Free/Other

· Area in Acr:


7
Established Year:

8
Sketch and Plan
Yes /   No 
9
Building status


No. of Building Blocks

Sl.No
Nature of Building (Pucca, Required minor Repair, Major  repair, Dilapidated
No. of Rooms
Type of Building (Pre KER, KER specification., HSS / VHSS spec.)
Floors(Ground Floor Only, First Floor ,SecondFloor,Third Floor,Fourth Floor,More than Four)
Roof Type(Concrete,Tiled, Asbetos  sheet, Other Permanent Sheet,Temporary Sheets)
Electrification Status(Yes/No)
Year of Construction
























10. (Use separate sheet if necessary)

11
Play Ground
:Yes /   No 

·      If Yes, Is play ground within the ownership of school


Yes  /  No


If No, Details:
Public/Private

12
Compound wall available
Yes  /  No

·     If Yes, Type of compound wall
Fully Built/Partially Built/Not Required

Name and Signature of
Filled by HM
Verified by CRCCs
Entered by MIS/ Data Entry





No comments:

Post a Comment